residential infrastructure

New construction of housing and infrastructure

Customer:

Woonpunt Zennevallei Cvba

Architect:

Filip De Mulder Architect Bvba - Wemmel

Construction period:

aug 2015 - jun 2017

Construction task:

2.443.503

Location:

Sint Pieters Leeuw

About the project

Eighteen new homes were built following the demolition of the existing buildings. The nature of the homes is diverse. There are staircase entrance dwellings and traditional terraced homes, detached homes and apartments. The homes connect two streets, part of which are pedestrian-only with a green zone.
The outdoor area includes outdoor parking facilities for 18 cars and a public road.
The works include structuring, finishing, technical work and environmental engineering.

Key figures

Construction surface  1.750 m² 
No. floors  1 tot 4 
Surface surrounding area  1.170 m²