industry

Elia Petrol

Customer:

Cegelec voor Elia

Architect:

noA architecten - Brussel

Construction period:

apr 2007 - dec 2008

Construction task:

3.026.278

Location:

Antwerpen

About the project

Construction of a substation (high voltage and medium voltage) in the port area of Antwerp.
The works include structural work, finishing, technical facilities and landscaping.

Key figures

Construction surface  2.300 m² 
No. floors 
Surface surrounding area  2.700 m²