residential infrastructure

New construction of terraced houses and urban villas with underground car park

Customer:

Dender Development Cvba (Matexi - Re-Vive)

Architect:

Denc!-Studio – Gent + Pascal Francois Architects - Aalst

Construction period:

jan 2015 - jul 2017

Construction task:

10.120.473

Location:

Aalst

About the project

An old industrial brownfield site was developed to become a new residential part of the city. The project consists of 27 terraced homes and urban villas with 49 apartments spread across three blocks. The blocks are connected underground to a communal car park for 54 cars. Both the homes and the apartments are built in accordance with the Nearly Zero Energy Building (NZEB) standards.
The works include structural work, finishing and technical facilities.

Key figures

Construction surface   
- Houses  3.645 m² 
- Urban villa’s  6.075 m² 
No. floors   
- Houses 
- Urban villa’s 
E-level  40 
Parking:   
- Surface  2.000 m² 
- No. floors  1 underground 
- No. sites  54