New construction of assisted living homes

Customer:

Villa Haletra Vzw

Architect:

Aiko Cbva - Architecten en Ingenieurs - Maldegem

Construction period:

feb 2017 - dec 2018

Construction task:

4.936.000

Location:

Aalter

About the project

Extension of Zorgcampus Veilige Have with 68 spacious assisted living homes spread across two blocks joined to each other by a tunnel for the care staff. The residents have direct access to the swimming pool located between the two buildings. A borehole energy storage field is constructed under the blocks
The works include the structural work.

Key figures

Construction surface  14.100 m² 
No. floors